Search for examiners by name.
Not found in current USPTO employee database

CASAREGOLA, LOUIS J

Overview

Summary

Examiner Ninja's Dataset

2239 Total Apps
2025 Issued
213 Abandoned
1 Pending

Allowance Rates

Overall Allowance Rate

Likelihood of Allowance Based on Examiner's Full USPTO Tenure
About this graph

The allowance rate is calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their lifetime tenure at the USPTO. In the future I plan to implement a filter which provides fine-grained control over this setting, allowing users to specify custom timeframes to look at.

Allowance Rate Before First Final Rejection

Likelihood of Early Allowance
About this graph

The allowance rate is calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their lifetime tenure at the USPTO. In the future I plan to implement a filter which provides fine-grained control over this setting, allowing users to specify custom timeframes to look at.

Allowance Rate After First Final Rejection

Likelihood of Allowance After RCE's, etc.
About this graph

The allowance rate is calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their lifetime tenure at the USPTO. In the future I plan to implement a filter which provides fine-grained control over this setting, allowing users to specify custom timeframes to look at.

Comparative Allowance Rates

Click Legend Items to Filter
About this graph

Compare the examiner's allowance rate with the overall allowance rate of the examiner's art unit and the overall allowance rate of the USPTO. If the examiner is known to be a current USPTO employee, the art unit used in the comparison is the examiner's current art unit. If the examiner cannot be identified as a current USPTO employee, the art unit of the examiner's last filed application is used.

All allowance rates are calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their tenure. Art unit and USPTO metrics are calculated from all applications filed in the past 15 years. In the future I plan to implement filters which provide fine-grained control over these settings, allowing users to specify custom timeframes to look at.

Strategies

Interviews

Allowance Rate With No Interview

About this graph

The allowance rate is calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their lifetime tenure at the USPTO. In the future I plan to implement a filter which provides fine-grained control over this setting, allowing users to specify custom timeframes to look at.

Allowance Rate With Interview

About this graph

The allowance rate is calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their lifetime tenure at the USPTO. In the future I plan to implement a filter which provides fine-grained control over this setting, allowing users to specify custom timeframes to look at.

Relative Benefit of Interview

About this graph

The relative benefit is calculated using the allowance rates ("AR"s) with and without the event:

Each examiner's metrics are calculated from all applications assigned to them across their lifetime tenure at the USPTO. In the future I plan to implement a filter which provides fine-grained control over this setting, allowing users to specify custom timeframes to look at.

Comparative Interview Allowance Rates

About this graph

Compare the examiner's allowance rates with and without interviews with the equivalent allowance rates for the examiner's art unit and the USPTO as a whole. If the examiner is known to be a current USPTO employee, the art unit used in the comparison is the examiner's current art unit. If the examiner cannot be identified as a current USPTO employee, the art unit of the examiner's last filed application is used.

All allowance rates are calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their tenure. Art unit and USPTO metrics are calculated from all applications filed in the past 15 years. In the future I plan to implement filters which provide fine-grained control over these settings, allowing users to specify custom timeframes to look at.

Comparative Benefits of Interviews

About this graph

Compare the examiner's relative benefit of receiving an interview with the equivalent relative benefit for the examiner's art unit and the USPTO as a whole. If the examiner is known to be a current USPTO employee, the art unit used in the comparison is the examiner's current art unit. If the examiner cannot be identified as a current USPTO employee, the art unit of the examiner's last filed application is used.

All relative benefits are calculated using the allowance rates ("AR"s) with and without the event:

Each examiner's metrics are calculated from all applications assigned to them across their tenure. Art unit and USPTO metrics are calculated from all applications filed in the past 15 years. In the future I plan to implement filters which provide fine-grained control over these settings, allowing users to specify custom timeframes to look at.

Appeals

Allowance Rate With No Appeal

About this graph

The allowance rate is calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their lifetime tenure at the USPTO. In the future I plan to implement a filter which provides fine-grained control over this setting, allowing users to specify custom timeframes to look at.

Allowance Rate With Appeal

About this graph

The allowance rate is calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their lifetime tenure at the USPTO. In the future I plan to implement a filter which provides fine-grained control over this setting, allowing users to specify custom timeframes to look at.

Relative Benefit of Appeal

About this graph

The relative benefit is calculated using the allowance rates ("AR"s) with and without the event:

Each examiner's metrics are calculated from all applications assigned to them across their lifetime tenure at the USPTO. In the future I plan to implement a filter which provides fine-grained control over this setting, allowing users to specify custom timeframes to look at.

Comparative Appeal Allowance Rates

About this graph

Compare the examiner's allowance rates with and without appeals with the equivalent allowance rates for the examiner's art unit and the USPTO as a whole. If the examiner is known to be a current USPTO employee, the art unit used in the comparison is the examiner's current art unit. If the examiner cannot be identified as a current USPTO employee, the art unit of the examiner's last filed application is used.

All allowance rates are calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their tenure. Art unit and USPTO metrics are calculated from all applications filed in the past 15 years. In the future I plan to implement filters which provide fine-grained control over these settings, allowing users to specify custom timeframes to look at.

Comparative Benefits of Appeals

About this graph

Compare the examiner's relative benefit of receiving an appeal with the equivalent relative benefit for the examiner's art unit and the USPTO as a whole. If the examiner is known to be a current USPTO employee, the art unit used in the comparison is the examiner's current art unit. If the examiner cannot be identified as a current USPTO employee, the art unit of the examiner's last filed application is used.

All relative benefits are calculated using the allowance rates ("AR"s) with and without the event:

Each examiner's metrics are calculated from all applications assigned to them across their tenure. Art unit and USPTO metrics are calculated from all applications filed in the past 15 years. In the future I plan to implement filters which provide fine-grained control over these settings, allowing users to specify custom timeframes to look at.

RCEs

Allowance Rate With No RCE

About this graph

The allowance rate is calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their lifetime tenure at the USPTO. In the future I plan to implement a filter which provides fine-grained control over this setting, allowing users to specify custom timeframes to look at.

Allowance Rate With RCE

About this graph

The allowance rate is calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their lifetime tenure at the USPTO. In the future I plan to implement a filter which provides fine-grained control over this setting, allowing users to specify custom timeframes to look at.

Relative Benefit of RCE

About this graph

The relative benefit is calculated using the allowance rates ("AR"s) with and without the event:

Each examiner's metrics are calculated from all applications assigned to them across their lifetime tenure at the USPTO. In the future I plan to implement a filter which provides fine-grained control over this setting, allowing users to specify custom timeframes to look at.

Comparative RCE Allowance Rates

About this graph

Compare the examiner's allowance rates with and without RCEs with the equivalent allowance rates for the examiner's art unit and the USPTO as a whole. If the examiner is known to be a current USPTO employee, the art unit used in the comparison is the examiner's current art unit. If the examiner cannot be identified as a current USPTO employee, the art unit of the examiner's last filed application is used.

All allowance rates are calculated using the total number of applications issued and abandoned as follows:

Each examiner's metrics are calculated from all applications assigned to them across their tenure. Art unit and USPTO metrics are calculated from all applications filed in the past 15 years. In the future I plan to implement filters which provide fine-grained control over these settings, allowing users to specify custom timeframes to look at.

Comparative Benefits of RCEs

About this graph

Compare the examiner's relative benefit of obtaining an RCE with the equivalent relative benefit for the examiner's art unit and the USPTO as a whole. If the examiner is known to be a current USPTO employee, the art unit used in the comparison is the examiner's current art unit. If the examiner cannot be identified as a current USPTO employee, the art unit of the examiner's last filed application is used.

All relative benefits are calculated using the allowance rates ("AR"s) with and without the event:

Each examiner's metrics are calculated from all applications assigned to them across their tenure. Art unit and USPTO metrics are calculated from all applications filed in the past 15 years. In the future I plan to implement filters which provide fine-grained control over these settings, allowing users to specify custom timeframes to look at.

History

Tenure

Applications Assigned To Examiner

By Filing Year and Current Application Status
About this graph

Shows all filed applications assigned to this examiner, broken down by filing year and the current status of the applications (issued, abandoned, or pending).

Workload

Recently Published Applications

App No. Title Filing Date Status
12950530 Arrangement for Controlling Fluid Jets Injected Into a Fluid Stream Nov. 19, 2010 Patented Case
12710863 Flexible Shaft for Gas Turbine Engine Feb. 23, 2010 Patented Case
12632841 Retrofit of Simple Cycle Gas Turbine for Compressed Air Energy Storage Application Having Expander for Additional Power Generation Dec. 08, 2009 Patented Case
12613605 Injector Assembly Having Multiple Manifolds for Propellant Delivery Nov. 06, 2009 Patented Case
12568195 Morphing Structure and Method Sep. 28, 2009 Patented Case
12404441 Apparatus for Operating Gas Turbine Engines Mar. 16, 2009 Patented Case
12395845 Apparatus for Mixing Substances Mar. 02, 2009 Patented Case
12393053 Gas Turbine Combustion System Cooling Arrangement Feb. 26, 2009 Patented Case
12393276 Method of Regulation of the Temperature of Hot Gas of a Gas Turbine Feb. 26, 2009 Patented Case
12392203 High Bypass-Ratio Turbofan Jet Engine Feb. 25, 2009 Patented Case

Timings

Timings

Examiner Timings

Average Number of Days Until...
427 First Rejection
565 First Final Rejection
658 Abandonment
772 Issue

Art Unit Timings (3741)

Average Number of Days Until...
911 First Rejection
1089 First Final Rejection
1226 Abandonment
1274 Issue

USPTO Timings

Average Number of Days Until...
695 First Rejection
947 First Final Rejection
1113 Abandonment
1104 Issue

Comments

Comments

No comments yet.
Be the first to leave a comment about your prosecution experience with this examiner

Share a Comment

Your email address will not be published. Required fields are marked with *
Available styles
<b>Bold</b>
<i>Italic</i>
<u>Underline</u>
<q>Quote</q>